Oyster Point Marina/Park
Project Status/Update
   
Public Education Services and Facilities Fees and Rates Employment Opportunities Newsletter Press Releases Project Status/Update FAQ/ Answers Local Businesses Public Access/Recreation Directions and Contacts Links
Oyster Point Ferry Terminal

  • East Basin Maintenance Dredging
  • Oyster Point Marina Ferries
  • East Basin Parking Lot and Roadway Lighting


  • East Basin Maintenance Dredging:
      East Basin Maintenance Dredging
      Ghilotti Brothers/Cooper Crane JV have begun maintenance dredging down to 8 feet in Oyster Point's East Basin. The job is expected to finish around the end of July.

      The dredging rig is behind the area where the ferry terminal will go.

    Oyster Point Marina Ferries:
      The ferry terminal construction’s first phase of dock removal and dredging is now complete. WETA has accepted constructions bids from Power Engineering to build the ferry terminal, and from Manson Engineering to build the float and gangway. The float will have two slips to serve two vessels. Construction is expected to start late this summer.


      Dredging rig in action. Depth will be lowered to ten feet in the channel and terminal area, with a twelve foot depth where the two ferry slips will be.

      Click here to read the WETA South San Francisco Ferry News
      Return to top.
    East Basin Parking Lot and Roadway Lighting:




    Rule
    Oyster Point Marina/Park 95 Harbormaster Road, #1 South San Francisco, Ca. 94080
    Voice: 650-952-0808 Fax: 650-871-7532 E-mail: oysterpoint@smharbor.com





    © Copyright 1998-2004 San Mateo County Harbor District and Web Market Consulting. All Rights Reserved.
    Half Moon Bay, California, USA.