Replace Dock D, E, F and G
Project Location: | Pillar Point Harbor |
---|---|
Status: | Not started |
Estimated Completion: | Based on available funding |
Description: | Docks have exceeded their service life and need to be replaced. There is currently available funding for of the three docks. |
Justification: | Docks are over 30 years old and need to be replaced. |
Strategic Goal/Operating Impact: | 1) Comprehensive Long-Range Planning Guides District Actions and Decision-Making. |
2) Infrastructure Improvements are Guided by Comprehensive Long-Term Planning. |

January 18, 2023
90% Pier Expansion/Dock Replacement plans complete, final permitting underway. 60% plans complete for electrical upgrades and repair crossmember spalling.
May 25, 2022
Board considered a Change Order for M&N to add design/engineering of electrical upgrades and to repair the crossmember spalling that was identified in the GHD condition survey.
February 4, 2022
Moffatt and Nichol submitted 30% plan drawings, General Manager and Director of Operations met with Moffat and Nichol to review.