Replace Dock D, E, F and G

Project Location:Pillar Point Harbor
Status:Not started
Estimated Completion:Based on available funding
Description:Docks have exceeded their service life and need to be replaced.  There is currently available funding for of the three docks.
Justification:Docks are over 30 years old and need to be replaced. 
Strategic Goal/Operating Impact:1) Comprehensive Long-Range Planning Guides District Actions and Decision-Making.
 2) Infrastructure Improvements are Guided by Comprehensive Long-Term Planning. 
May contain: water, marina, waterfront, watercraft, transportation, vehicle, vessel, pier, port, and dock

January 18, 2023

90% Pier Expansion/Dock Replacement plans complete, final permitting underway. 60% plans complete for electrical upgrades and repair crossmember spalling.

May 25, 2022

Board considered a Change Order for M&N to add design/engineering of electrical upgrades and to repair the crossmember spalling that was identified in the GHD condition survey.

February 4, 2022

Moffatt and Nichol submitted 30% plan drawings, General Manager and Director of Operations met with Moffat and Nichol to review.

 

Draft Initial Study/Environmental Checklist Johnson Pier Reconfiguraton, Vessel Dock and Fuel Dock Replacement Project